| Description |
| Install Door System for Choir Room and Youth Diretctors Office |
| Flat Roof over activity center repaired |
| Church Roof Re-Shingled |
| Hot Water Tank repaired |
| Fix damaged downspout along side Cry Room. |
| The church sign at night goes dark, then flickers about 6 or 7 times off and on and then comes back on fully lited. Thanks for your help |
| Cut and Remove electric supply line to old church sign and fill with epoxy. |
| Install Door System for Activity Center (Kitchen and Storage Room) |
| Fix backsplash in ABC kitchen |
| Fix toilet from running in Womens bathroom by Friends School |
| Fix Backup Programs on Server. |
| Light out in Church Office |
| One of the vertical lamps is not lit on the cross at the front of the church for the past several Sundays. |
| Address overgrown shrubs along Kresge Way and rest of church. Remove dead pine |
| Clean gutters from leaf debris |
| Install new KT200 board. |
| Remove hanging limbs from trees on north side |
| Install cutoff of door locks when Fire Alarm is activated |
| Fix downspout in Garden |
| Install Strike and Reader for Finance door |
| Install Electric Door strike on office door |
| Install Strike and Reader for Vestry Door |
| Repair lock on Main Church door crash bars |
| Repair door holder on door between AC and bathrooms |
| Enhanced repair to roof siding over ABC Kitchen |
| Repair Siding Act Center |
| Fix Mini AC units to drain outside (Finance, Cry, etc). |
| Repair leaking dishwasher ABC Kitchen |
| Replace insulation over Friends School Office |
| Dispose of copier in martins office |
| Fix Exterior Faucet outside of Friends School so it wont freeze over the winter |
| Replace cover on outside outlet on North side of AC |
| Replace ceiling tiles in ABC rooms damaged by prior roof leakage. |
| Lights in Parking lot |
| Replace bulbs in Activity Center |
| Replace Floreescent Bulbs in AC |
| M80 Bulb for Light on side of AC and replace. |
| Repair leak in Room 12/14 ceiling (Ac Drain) |
| Replace Ice Maker in ABC Kitchen |
| Fix Ice Maker in ABC Kitchen |
| Remove old Sign |
| Repair ruptured pipe over Friends school office |
| Finish installing Air Conditioner in Storage Bldg. |
| Hot wiring the Thermostats throughout the building |
| Ice machine in ABC kitchen is making ice but it is melting and we have water in the bottom |
| Paint or cover outside Nave. Scheduled For Spring |
| Install and Setup Electronic Door Locks |
| Check out refrigerator in Diehl Hall Kitchen to see if it is stopped up - water collects in bottom of refrigerator and comes out on the floor |
| Repair Office AC Unit |
| Dishwaher in Activity Center is leaving a grease film on dishes |
| Fix Fire Alarms |
| Replace batteries in Emerg Lights in AC |
| Fix lights in Womens Restroom Deihl Hall |