St. John Lutheran Church
Property Status
Current To-Do List
Items in red are currently being worked
| Description |
| PLEASE REPAIR THE LIGHT BEHIND THE LEFT CROSS ARM SEGMENT OF THE CROSS INSIDE THE CHURCH BEHIND THE CHOIR SEATING. DOES NOT LITE UP FOR PASS 2 WEEKS. THANKS |
| THE LIGHT ON THE PULPIT SIDE OF THE SIDE WALL OF THE CHURCH OVERHEAD OF THE LOCATION OF DRUMS HAS NOT LITE FOR SEVERAL WEEKS. PLEASE REPAIR |
| Develop Emergency diagrams and procedures for St John systems |
| Network Thermostats so computer can monitor status |
| Boys Batroom by Friends, Handicap stall latch is sticking. |
| Hot water circulation pump in AC. |
| door knob missing on door between rooms 13 and 15 |
| Gutter is loose on Friends School side of building. |
| Wall mat loose and taken down in Gym |
| Replace broken toilet paper holder in front boys bathroom |
| Wireless Access for Laptops |
| Build sound deadening box for air compressor |
| Replace metal filter on AC Kitchen roof unit. |
| Clean up Basement |
| Change Furnace Filters (every 6 mo) Last Changed ??/??/?? |
| Check Furnace blower belts |
| Check batteries in all other emerg lights. |
| 7E5qfd jsneevyvvmpg, [url=http://ufqdwzfavhxz.com/]ufqdwzfavhxz[/url], [link=http://kyjreouonxhz.com/]kyjreouonxhz[/link], http://obnkvkecmiez.com/ |
Items recently completed
| Capital Projects
|